Wellpoint Dewatering Services

We plan, install and run wellpoint dewatering systems with our own 8" diesel pump sets — lowering the water table around your excavation before you dig, so foundations, basements and trenches stay dry and stable.

Wellpoint dewatering

Lower the water table first, then dig in the dry


A wellpoint system is a line or ring of small-diameter wells — wellpoints — jetted into the ground around the excavation. Each wellpoint connects through a flexible swing pipe to a header main, and a pump set draws water from all of them at once.

Open pumping deals with water after it has reached the excavation. Wellpoints intercept the groundwater outside it and pull the water table down before and during the dig. The sides stay stable, the base stays firm and your crew works in the dry instead of in mud.

GEE AAR installs and runs the complete system with its own diesel engine-driven pump sets, built in our works in Ghaziabad. If your team prefers to install the wellpoints itself, you can rent or buy the pump sets alone.

  • Water table lowered before excavation
  • Stable sides and a dry base
  • Suits sandy and silty ground
  • Diesel drive — no site power needed
Illustration: GEE AAR 8 inch diesel pump set connected to a wellpoint header pipe beside an excavation
Illustration made from photos of our own pump set; not a photograph of a client site.

Choosing the method

When wellpoints are the right answer — and when they are not


Wellpoints suit…

  • Permeable ground — sands, silty sands and sandy gravels
  • A high water table that would flood the excavation or make the base boil
  • Foundations and basements, pump houses, tanks and underpasses
  • Pipeline and sewer trenches, where a line of wellpoints runs alongside the trench
  • Drawdowns of about 5–6 m per stage — deeper with a second stage lower down

Another method may be better when…

  • The ground is stiff clay — water moves too slowly for wellpoints, and open sump dewatering is usually simpler and cheaper
  • You only need to clear rainwater or surface seepage
  • The ground is very coarse gravel or the drawdown is very deep — deep wells may suit better

Not sure? Send us the soil report or bore log and the water level and we will tell you which method fits.

Our process

How we plan, install and run a wellpoint system


1 · Site information

Drawings, excavation depth and size, soil report or bore log, current water level, how far it must come down and for how long.

2 · Layout and sizing

Wellpoint spacing and depth, the header route, the number of pump sets and where the water will be discharged.

3 · Installation

Wellpoints jetted to depth around the excavation, connected by swing pipes to the header main.

4 · Pump sets connected and started

Our 8" diesel pump sets go on the header. We check the drawdown before excavation starts.

5 · Running through the dig

The system keeps running while you excavate and build. Fuel, attendance and monitoring arrangements are agreed with you before we start.

6 · Removal

When the structure no longer needs the water held down, we stop the system and remove the wellpoints, header and pump sets.

Our pump sets

Built in our own works, ready for dispatch


Every wellpoint system we run uses our own diesel engine-driven centrifugal pump sets — so the pump, the spares and the service all come from one maker.

Pump
Centrifugal, diesel engine driven
Suction × discharge
8" × 8" (200 × 200 mm)
Flow
80 – 90 L/s (288 – 324 m³/h)
Head
6 m
Speed
1,500 RPM
Mounting
Skid with lifting frame
See the pump sets
GEE AAR 8 inch diesel dewatering pump sets ready for dispatch

To quote

What we need from you


  • Site location and a layout or drawing of the excavation
  • Excavation depth, length and width
  • Soil report or bore log, and the current groundwater level
  • How far the water must be lowered, and for how many weeks or months
  • Where the pumped water can be discharged

Send these on WhatsApp or by email and we will come back with a proposed layout and a quotation.

Questions

Wellpoint dewatering, answered plainly


What is wellpoint dewatering?

A wellpoint system is a line or ring of small-diameter wells, called wellpoints, jetted into the ground around an excavation. Each one is connected by a flexible swing pipe to a header main, and a pump set draws water from all of them at once. It lowers the water table before and during excavation, so the sides stay stable and the base stays dry.

How deep can a wellpoint system lower the water table?

As a general guide a single stage of wellpoints lowers the water table by about 5 to 6 metres below the header, because the pump lifts the water by suction. Deeper drawdowns are done with a second stage of wellpoints installed lower in the excavation. Send us the excavation depth and the water level and we will propose the arrangement.

Which soils suit wellpoint dewatering?

Wellpoints work best in permeable ground such as sands, silty sands and sandy gravels with a high water table. In stiff clay the water moves too slowly for wellpoints and open sump pumping is usually better. In very coarse gravel or where a very deep drawdown is needed, deep wells may be more suitable. We will tell you which method fits your ground.

Do you install and run the system, or only supply the pumps?

Both. We can plan, install and run the complete wellpoint system with our own 8 inch diesel pump sets, or we can rent or sell the pump sets alone if your team installs the wellpoints.

What is the difference between wellpoint and open (surface) dewatering?

Open dewatering collects water that has already reached the excavation in ditches and a sump and pumps it away. Wellpoint dewatering intercepts the groundwater outside the excavation and lowers the water table before you dig. Wellpoints suit permeable sandy ground; open pumping suits cohesive ground and rainwater or seepage.

Where do you take on wellpoint dewatering work?

We are based in Ghaziabad and work across Delhi NCR. For sites in other states, tell us the location and the job and we will confirm what we can do.

Related

Surface (open) dewatering

Ditches and a sump inside the excavation — for cohesive ground and rainwater.

8" diesel pump sets

The pump sets we use, available to rent or buy.

Dewatering pump on rent

Daily, weekly and monthly hire.

Rubber sleeves

Moulded in-house to your size and compound.

Need the water table down on your site?

Tell us the location, excavation depth and soil — we will propose a wellpoint layout and quote for installing and running it.